Salt River Project distribution, design and transmission construction services

SRP Distribution Design

Get all the information you need about SRP construction services related to Distribution Design.

Start or access your projects

Manage your construction projects through the SRP Project Plan Portal. All projects requiring SRP Distribution Design services must be submitted, reviewed and managed through the portal. Learn more about using the SRP Project Plan Portal on the construction services homepage.

For questions or support, call (602) 236-0777(602) 236-0777

Start a new project

New to SRP's Project Plan Portal? Fill out a brief form to receive your account invitation and start a project.

Get startedOpen new site.
Access existing projects

Already have an account? Log in to SRP’s Project Plan Portal to view your most recent projects or submit a new plan.

Log in to my portalOpen new site.

Explore our services

SRP provides a variety of information and services to help customers modify power distribution and transmission for their construction projects:

Icon
Request a point-of-feed location

Submit form
Icon
Request a meter at a location

Submit form
Icon
Request temporary electric service

Submit form
Icon
Look up new construction project timeline

Lookup page
Icon
Review construction specification documents

Find information
Icon
Review electrical specification guidelines and handbooks

Find information

To see a list of current projects, visit the grid management and improvement projects page.

If you are a cellular and communications company looking to initiate new projects, please email [email protected].

Estimating power-related job costs

To assist contractors and developers, SRP provides requested rough estimates of construction charges to prepare project budgets in advance of breaking ground.

Construction fees vary based on services requested.

If you need additional help, email [email protected] and someone will respond within 48 hours Monday through Friday.

Basic estimating assumptions

The estimated charges shown below are based on:

  • Construction jobs that include up to 1,000 feet of primary construction
  • Customers providing all trenching and conduit needed for construction

Exact charges will be determined after thorough plan review and discussion. Explore the resources below for information on pricing based on your project.*

*Estimated charges are subject to change at SRP’s discretion and are revised every six months. All prices are for estimating purposes only.

**New residential multiunit projects: For pricing for new residential multiunit projects such as apartments, condominiums and townhomes, please email [email protected].

Construction process for Distribution Design projects

Predesign

Submit plans in the SRP Construction Project Plan Portal.

Include:

An SRP representative will work with you to gather all the required information about your project. Then a meeting will be scheduled to review your plans, discuss responsibilities on the Customer ChecklistDocument is a PDF and develop a timeline.

Predesign

Submit plans in the SRP Construction Project Plan Portal.

Include:

An SRP representative will work with you to gather all the required information about your project. Then a meeting will be scheduled to review your plans, discuss responsibilities on the Customer ChecklistDocument is a PDF and develop a timeline.

Design

Once your documents are reviewed, a design plan will be made for your project in the following order.

  1. Receive design plans, known as redline prints
  2. Review and request any changes
  3. Have the property blue-staked by Arizona 811
  4. Receive SRP survey requirements (control points)
  5. Complete and return the Owner Agreement (See a sampleDocument is a PDF)
  6. Review and sign the construction responsibilities contract with details on SRP responsibilities and any required fees. (See a sampleDocument is a PDF)
  7. Submit the first payment (25%) for design fees; nonrefundable
  8. Receive construction prints

Design

Once your documents are reviewed, a design plan will be made for your project in the following order.

  1. Receive design plans, known as redline prints
  2. Review and request any changes
  3. Have the property blue-staked by Arizona 811
  4. Receive SRP survey requirements (control points)
  5. Complete and return the Owner Agreement (See a sampleDocument is a PDF)
  6. Review and sign the construction responsibilities contract with details on SRP responsibilities and any required fees. (See a sampleDocument is a PDF)
  7. Submit the first payment (25%) for design fees; nonrefundable
  8. Receive construction prints
You can either pay in full or make two payments:
You can either pay in full or make two payments:
  • The first 25% payment covers design fees and is nonrefundable.
  • The final 75% payment is due 60 days before your project is connected to the power grid.

Preconstruction Meeting

Customer construction can begin after meeting with your SRP design consultant to review your construction prints that detail SRP and your construction responsibilities and inspections to be performed. Any additional contractors may attend the Preconstruction Meeting too.

Preconstruction Meeting

Customer construction can begin after meeting with your SRP design consultant to review your construction prints that detail SRP and your construction responsibilities and inspections to be performed. Any additional contractors may attend the Preconstruction Meeting too.

Inspection

To ensure a smooth inspection, establish a billing account before inspections, and have letter of authorization ready if street lighting is included.

Review the specification and guidelines for information on what will be inspected.

Setting up a billing account

Prior to inspection, make sure to have your billing account set up. Here are the steps:

  1. Complete the billing details formDocument is a PDF along with the meter load summaryDocument is a Word document form for each meter socket in order to establish your utility account. 
  2. Once you've completed the forms, contact SRP at (602) 236-0777(602) 236-0777 or email [email protected].

Inspection

To ensure a smooth inspection, establish a billing account before inspections, and have letter of authorization ready if street lighting is included.

Review the specification and guidelines for information on what will be inspected.

Setting up a billing account

Prior to inspection, make sure to have your billing account set up. Here are the steps:

  1. Complete the billing details formDocument is a PDF along with the meter load summaryDocument is a Word document form for each meter socket in order to establish your utility account. 
  2. Once you've completed the forms, contact SRP at (602) 236-0777(602) 236-0777 or email [email protected].
In need of a meter?
In need of a meter?

Use this meter spot request form to request one for your project location.

SRP Construction

If your project requires any construction by SRP as outlined in the construction responsibilities contract, our construction crews will begin when your part of the construction is complete.

Completed construction meets these requirements:

  • You've passed 100% of SRP inspections
  • You've executed all necessary easements
  • You've submitted all payments and contracts

Construction typically begins within seven days of your final inspection. Your team of construction consultants, supervisors and foremen will work with you to stay on your timeline and will be in regular communication.

SRP Construction

If your project requires any construction by SRP as outlined in the construction responsibilities contract, our construction crews will begin when your part of the construction is complete.

Completed construction meets these requirements:

  • You've passed 100% of SRP inspections
  • You've executed all necessary easements
  • You've submitted all payments and contracts

Construction typically begins within seven days of your final inspection. Your team of construction consultants, supervisors and foremen will work with you to stay on your timeline and will be in regular communication.

Need help?
Need help?

Email [email protected]. Someone will respond within 48 hours Monday through Friday.

Specifications and guidelines

Distribution construction standards and electric service specifications manuals
Construction standards and service specifications for connecting to the SRP power system.

SRP Technical ProvisionsDocument is a PDF
General information to consider when planning or performing construction activities near SRP’s power and water facilities.

Utilities crossing or parallel to SRP irrigation pipeDocument is a PDF
Guidelines on overcrossings of SRP irrigation pipes for water engineering construction projects.

Right-of-way guidelinesDocument is a PDF
General guidelines to help you plan your water engineering construction project.

Design guidelines and specifications for bridge crossings of SRP canalsDocument is a PDF
General information and design requirements that must be met for bridge crossings of the SRP canal system.

Water engineering contractor packetDocument is a PDF
SRP construction specifications and references.

Frequently asked questions

Find answers to some of the most frequently asked questions about construction services.

The SRP distribution system (No. 7 and No. 8) brings power from substation sites (No. 6) to residential and industrial/commercial buildings.

How electricity gets to you image

Call (602) 236-0777(602) 236-0777. Please have the address or account number handy.

This information is listed in Section 9 of the Electric Service Specifications Manual. You can also email SRP’s shop drawings department for the SES/meter panel at [email protected].

Time frames can vary greatly depending on the nature of your project and the scope of work required. It can take anywhere from a couple of days for a small project to multiple months for a more complex project.

There are things you can do to help move the process along. Being responsive to requests for information and making sure that contractors get their work done in a timely manner can greatly reduce the amount of time it takes to get a meter.

SRP will need to inspect any trench and conduit work, as well as any electrical panels that SRP will meter. Call the SRP Inspections number. This number is listed within the "Contacts" box on your job print. SRP Inspections groups are determined by locale.

A redline print is basically a fully completed utility design that will be given to you early in the design process for review and approval. It is a bid-quality product designed to help you engage contractors before construction prints have been produced.

If you wish to simply turn on service to an existing home, please call (602) 236-8888(602) 236-8888. For an existing business, call (602) 236-8833(602) 236-8833. If you wish to make modifications to your service, please call (602) 236-0777(602) 236-0777 or use our online form. Please have the address available.

This information can be found on pages 1–31 through 1–35 in Section 1 of the online Electric Service Specifications Manual. To request fault current data for arc flash studies, please email [email protected] and include address(es) and SRP meter number(s) along with requester contact information.

For questions or support, call (602) 236-0777(602) 236-0777