Contractor-supplied material
All customers are required to provide and install the underground
material infrastructure which SRP will utilize for the electric distribution system to serve the
development.
The following information provides descriptions, specifications and approved manufacturers,
including part numbers (where applicable) for this material.
Exceptions are not allowed. Alternate materials must be evaluated and
approved before use, as explained on page iii.
Download a copy of the contractor-supplied material document (5.8MB).
This document is updated periodically. Please refer to the updates section below to view specific pages that have been updated.
To easily locate specific pages within each PDF section: Simply drag the thin bar on the
left side of your screen to the right and click on the bookmark or thumbnail tabs. You can
then click on a bookmark or thumbnail page to go directly to that page.
To search for keywords within a section: Simply click on the "Search" button (with the binoculars icon) at the top left of your Adobe Acrobat toolbar. Then enter your keywords in the box at the right.
The following pages have been revised since the 2005 contractor-supplied material book was printed and distributed. The PDF file above has already been updated with the revised pages listed below.
Updated pages:
Index, p. 21, p. 45
