Springerville Unit 4 expansion project
SRP is constructing a new 400 MW, coal-fired generating unit at the existing Springerville Generating Station (SGS) in Springerville, Arizona.
The new generating unit, Unit 4 (or SGS4) will help SRP meet future customer needs and provides the utility with a more diverse generation portfolio.
- Generating capacity: Unit 4 has 400 MW of generating capacity.
- Expansion cost: The Unit 4 expansion project will cost approximately $600-700 million.
- Fuel source: Low-sulfur coal. Historically, coal has lower price volatility and will provide a more secure energy future for Arizona than other fuels. In addition, coal reduces our dependence on natural gas.
- Emissions: Air emission controls on Unit 4 will meet EPA's Best Available Control Technology (BACT) requirements. Furthermore, emission controls on Units 1 and 2 were upgraded as part of the plant expansion. As a result, emissions from all four units will be less than the original two units.
- Environmental impact: The plant utilizes a proven and dependable water supply. Well fields that supply the four units are from aquifers deeper and separate from the aquifer that the towns rely on.
- Economic impact: This plant further enhances the Apache County economic base by expanding the property tax base and the addition of new full-time, high-paying jobs with benefits.
- Start of construction: February 2007.
- Plant completion: Completion and commercial operation is planned for December 2009.
- Architect/engineer: Washington Group International is retained.
- Construction duration: Construction will take approximately three years.
- Peak construction: Approximately 1,200 craftspeople will be employed during construction.
- Total construction hours: Approximately 3.5 million hours are needed.
- Construction site services: Bid awarded, no employment opportunities.
- Concrete supply: Champion, (928) 245-0602.
- Structural steel erection: Shurtleff & Andrews Corp., (928)337-3784.
- Substructures: Kiewit Western, (602) 437-7786.
- Cooling tower: International Cooling Tower, 1 (800) 661-3645.
- Boiler: Foster Wheeler, (928) 333-2259.
- Mechanical: The Industrial Company (TIC), (520) 744-5001, ext. 13.
- Electrical: The Industrial Company (TIC), (520) 744-5001, ext. 13.
- Start-Up: PIC Energy Services, Inc., (770) 850-0100, ext. 4244.
Please contact an SRP representative at 1 (800) 380-6123 with questions or comments about the project.